Every line of your CASp report, built and measured.
Hand us the report or the demand letter. We walk the site, price each finding against its item number, schedule restroom and entrance work after you close, and put a level and a tape on every fix before we call it done.
What we build
Six scopes cover nearly every finding a CASp inspector writes up at a small commercial property. Pick the ones your report lists.
Parking & path of travel
Restripe stalls and access aisles, set signs, regrade over-slope stalls, and pour the route to the door.
02Curb & entry ramps
Demo and repour curb ramps, set detectable warning surfaces, build entry ramps, landings and handrails.
03Entrances & doors
Lower thresholds, swap knobs for lever hardware, adjust closers, widen openings or add power operators.
04Restrooms
Relocate fixtures, install grab bars, wrap pipes, reset accessories and open up turning space.
05Counters, signage & floors
Cut in lowered counter sections, adjust drinking fountains, add tactile and braille signs, fix level changes.
06Closeout packet
Before-and-after photos, measured dimensions and slope readings, filed under each report item number.
We quote against your report numbers, not a square-foot guess
Every row on our quote carries the item number from your CASp report or the paragraph from the demand letter. You can see which dollars fix which finding, hand the sheet to your attorney or landlord, and decide what gets built first.
- ✓Fixed price per item, one fixed contract total.
- ✓Hidden conditions, like a drain line that is not where the plans show it, go on a written change order before we proceed.
- ✓Larger jobs bill in stages tied to finished work, not to dates.
- Site walk
- Quote
- Schedule
- Closeout
Quote: retail storefront, Sacramento
Fixed total
Line items
| Work item | Fixed price |
|---|---|
| Restripe van stall + access aisle, signs Parking lot, east side | $2,640 |
| Regrade stall to max 1:48 slope Grind and patch asphalt | $3,180 |
| Repour curb ramp, detectable warnings Route to main entry | $7,450 |
| Lever hardware, closer adjustment Main entry pair | $1,120 |
| Relocate lavatory, insulate pipes Single-user restroom | $5,860 |
Work the restroom after close, reopen it by morning
Restrooms and entrances are where a remodel shuts a business down. We split the work into shifts that each end with a usable room and a safe door.
- Night 1Lay out the toilet centerline at 17 to 18 inches from the side wall, open the wall for blocking, set backing for the grab bars.
- Night 2Reset the water closet to a 17 to 19 inch seat height, move supply and drain at the lavatory, wrap exposed pipes.
- Night 3Mount side and rear grab bars, drop mirror, soap and towel dispensers to reach range, patch and paint.
- CloseMeasure every dimension, photograph it, and hand the room back before opening.
Partitions and flooring come along only when the clearances cannot be met without them. Night and weekend shifts are priced into the quote.
- Site walk
- Quote
- Schedule
- Closeout
Measured record
Before / after photos attached
- Items closed
- 14 of 14
- All photographed
- Readings logged
- 62
- Slope, height, clearance
Field measurements
| Item | Measured | Result |
|---|---|---|
| Access aisle cross slope Ref 1.04 | 1.6% | Within |
| Van stall width Ref 1.03 | 145 in | Within |
| Toilet centerline to side wall Ref 4.02 | 17.5 in | Within |
| Toilet seat height Ref 4.03 | 18 in | Within |
Put a level on it before we leave
Each finished item gets a photo from the same angle as the before shot, plus the readings that matter for it: running and cross slope with a digital level, heights and clearances with a tape. The packet is sorted by report item number.
Give it to your CASp for the re-inspection or to your attorney. We document the work; the compliance determination stays with your CASp, and legal advice stays with your lawyer.
Have the report on your desk? We can read it this week.
Email us the PDF →