Six scopes, each tied to a report item
Each service below lists what it covers, what it leaves out, what you get at the end and how long it usually takes. Starting prices are typical floors; your quote is fixed per item after we walk the site.
How we price
- 01 Site walk at no charge inside our four counties.
- 02 Itemized quote within 5 working days, one fixed price per report item.
- 03 One fixed contract total. Night and weekend shifts are already in it.
- 04 Hidden conditions go on a written change order you sign before we proceed.
- 05 Contracts over $25,000 bill in stages: 10% at mobilization, 40% at rough-in, 40% at substantial completion, 10% on closeout packet delivery.
Accessible parking & path of travel
Lay out the stalls to the current California numbers, not the federal minimums. CBC 11B sets a standard accessible stall at 108 inches wide, a van stall at 144 inches, both at least 216 inches long, with a 60 inch access aisle.
- Starting at
- $1,850
- restripe one van stall with signs
- Typical duration
- Restriping and signs: 1 night. Regrading and route work: 3 to 8 working days.
Included
- +Grinding out old striping and restriping stalls and access aisles: blue borders, hatching, 12 inch NO PARKING lettering
- +ISA symbol on the stall surface, pole-mounted stall signs, minimum-fine and tow-away signs
- +Grinding, patching or regrading stalls and loading areas that exceed 1:48 slope in any direction
- +Pouring or repairing the accessible route from the stalls to the entrance
Not included
- −Full lot repaving or seal coating outside the accessible stalls and route
- −Lighting and drainage redesign
You receive
Measured stall and aisle dimensions, slope readings at each corner, sign photos.
Curb ramps & entry ramps
Saw-cut, demo and repour. Curb ramps are concrete work, and the slope has to be right when the forms come off because there is no adjusting it afterward.
- Starting at
- $6,800
- single curb ramp, demo and repour
- Typical duration
- One curb ramp: 2 to 4 days including cure time. Entry ramp with rails: 1 to 3 weeks.
Included
- +Demolition and repour of concrete curb ramps, flares and landings
- +Detectable warning surfaces set in the fresh pour or retrofitted
- +New or rebuilt entry ramps and top and bottom landings
- +Handrails and guards, fabricated and anchored
Not included
- −Ramps in the public right-of-way (city encroachment work)
- −Structural retaining walls
You receive
Running and cross slope readings at form strip, landing dimensions, rail heights, photos.
Entrances & doors
Most door findings are hardware findings. We test the opening force with a gauge before and after, and fix the cheap thing first.
- Starting at
- $650
- per door, lever hardware and closer adjustment
- Typical duration
- Hardware and closers: 1 visit. Widened opening or power operator: 3 to 10 working days.
Included
- +Lowering or replacing thresholds and beveling level changes at the sill
- +Lever handles, panic hardware and pulls installed at the correct mounting height
- +Closer adjustment or replacement for opening force and closing speed
- +Widening door openings and reframing, or adding a power door operator where width cannot be gained
Not included
- −Storefront glazing system replacement
- −Access control and security systems
You receive
Opening force readings, clear width, threshold height, hardware photos.
Accessible restrooms
Lay out from the toilet centerline outward. California wants 17 to 18 inches to the side wall, 60 by 56 inches of clear floor around the water closet, and a 17 to 19 inch seat height.
- Starting at
- $14,500
- single-user restroom
- Typical duration
- Single-user room: 3 to 6 night or weekend shifts. Multi-stall room: 2 to 4 weeks, phased.
Included
- +Relocating toilets, lavatories and urinals and resetting heights
- +Wall blocking and side and rear grab bars
- +Insulating or covering exposed supply and drain pipes under lavatories
- +Lowering mirrors, soap, towel and seat-cover dispensers
- +Enlarging turning space; partitions and flooring when clearances require it
Not included
- −Adding new restrooms or new plumbing fixtures counts
- −Finish upgrades beyond what the corrections disturb
You receive
Fixture centerlines, heights, clear floor and turning space dimensions, grab bar lengths, photos.
Counters, signage & interior items
Small items, long lists. We batch them into one or two visits so you are not booking a crew for each finding.
- Starting at
- $2,400
- lowered counter section
- Typical duration
- 1 to 3 visits, usually before opening or after close.
Included
- +Lowered sections at service and checkout counters
- +Drinking fountain height and knee clearance adjustments
- +Tactile and braille room identification signs mounted at the right height and location
- +Fixing floor level changes, transitions and loose carpet edges
Not included
- −New casework and millwork beyond the lowered section
- −Point-of-sale equipment relocation
You receive
Counter heights and lengths, sign mounting heights, transition photos.
Closeout packet
Record the before state, then the after state, under the same item number. California's advisory notice to defendants recommends photographing and measuring barriers before they are corrected; we start the packet at the site walk.
- Starting at
- Included
- in every contract
- Typical duration
- Delivered within 5 working days of substantial completion.
Included
- +Before photos taken at the site walk, after photos from matching angles
- +Measured dimensions and slope readings for each item
- +Index organized by CASp report item number or demand letter paragraph
- +PDF delivered by email, ready for your CASp re-inspection or your attorney
Not included
- −CASp inspection or re-inspection
- −Any statement that the property is compliant
- −Legal advice
You receive
One indexed PDF per project.
What we leave to others
CASp inspections. We build from a report a Certified Access Specialist has already written. Our scope is the report's scope.
Compliance determinations. We measure and record. Whether the site complies is your CASp's call at re-inspection.
Legal advice. Deadlines, defenses and who pays between landlord and tenant are questions for your attorney and your lease.
Homes and new buildings. We work only on existing commercial property. No residential remodels, no ground-up construction.
Federal tax provisions such as the Disabled Access Credit (IRS Form 8826) and the Section 190 barrier removal deduction may offset part of the cost for qualifying businesses. Ask your tax professional; our itemized invoices make the paperwork easier.
Request a site walk